Director's Letter
1
State of Washington
DEPARTMENT OF FISH AND WILDLIFE
Mailing Address: P.O. Box 43200, Olympia, WA 98504-3200 • (360) 902-2200 • TDD (360) 902-2207
Main Office Location: Natural Resources Building, 1111 Washington Street SE, Olympia, WA
September 26, 2023
Mr. David Schumacher
Director, Office of Financial Management
P.O. Box 43113
Olympia, WA 98504-3133
RE: 2024 Supplemental Capital Budget Request
Dear Mr. Schumacher:
The Department of Fish and Wildlife’s (WDFW) 2024 Supplemental Capital Budget Request is
attached. This supplemental budget request reflects the Department’s continued dedication to
preserving healthy fish and wildlife populations, sustainable outdoor experiences, supporting a
strong economy and social values, and pursuing operational excellence. This request represents
emergent critical needs requiring funding in the supplemental budget.
All projects submitted in this Supplemental are modifications of larger projects submitted in the
23-25 Capital Budget request and are covered in the previously submitted 10-year plan, and have
also been reviewed by DAHP as part of the 23-25 submittal. The supplemental projects represent
the most critical components of our previous request.
Domestic Water Repairs
The general category of Statewide Domestic Water Repairs had 2 systems that are currently not
compliant with Department of Health standards for a group water system. We are requesting
$275,000 to repair only the most urgent needs of the Department. Remaining projects will be
requested in the 25-27 biennium.
Ringold Hatchery Pre-Design
The FY23-25 capital budget included a request for design and construction of new ponds for the
RIngold hatchery which did not receive funding. There are additional projects at that location in
the 10-year plan. The hatchery has experienced an emergent biological issue that is threatening
fish health and will be requiring extensive design changes moving forward. The request of
$200,000 in the 2024 supplemental is to perform a pre-design for all future construction phases
that incorporates the necessary water treatment and pond construction to reduce risk to fish.
David Schumacher
September 26, 2023
Page 2
Sekiu Boating Access Acquisition
The Sekiu access is a popular fishing launch in the Strait. It is privately owned and up for sale.
WDFW has been working with the owners for years to secure the purchasing rights. Sekiu Access
has been included in the agency 10-year plan and has previously secured $900,000 of RCO grant
funding towards purchase of the site. With all acquisition requirements met including surveys,
aquatic leases, and appraisals, we are requesting $2.8M to complete the purchase of this site. This
is an urgent request to keep the property and the launch open to the public.
Thank you for your time and consideration. Department staff are available to assist you with
evaluating this request and will be happy to answer any questions as they arise. Please contact
Kristen Kuykendall, Capital and Asset Management Program Director, at 360-490-4429 for
additional information.
Sincerely,
Kelly Susewind
Director
Enclosure
Cc: Washington Department of Fish and Wildlife Commissioners
Washington Department of Fish and Wildlife:
Amy Windrope, Deputy Director
Nate Pamplin, Policy Director
Kristen Kuykendall, Capital and Asset Management Program Director
Morgan Stinson, Chief Financial Officer
Table of Contents
4
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
CAPITAL BUDGET 2024 SUPPLEMENTAL REQUEST
TABLE
OF
CONTENTS
TAB A – Ten Year Plan Summary
Ten Year Capital Program Summary (CBS 001) ............................................ 6
DAHP Review
Letter .................................................................................... 10
FTE Summary Job Description and FTE Details (CBS 004) CBS Report ... 11
FY 24 Backlog of Projects ........................................................................... 12
TAB B All Preservation Projects
Capital Project Requests Related to Preservation (CBS 002) CBS report .. 23
TAB C All Programmatic Projects
Capital Project Requests Related to New or Expanded Programs (CBS 002)
CBS report ................................................................................................... 31
T
AB D – Grant and Loan Programs
Capital Project Requests Related to Grant and Loan Programs .................. 40
5
TAB A – Ten Year Plan Summary
6
*
477 - Department of Fish and Wildlife
OFM
2023-25 Biennium
Ten Year Capital Plan by Project Class
Version: DH WDFW 2024 Supplemental Request
Date Run: 9/27/2023 4:44PM
Report Number: CBS001
Project Class: Preservation
Project by Account-EA Type
Estimated
Total
Prior
Expenditures
Reapprop
2023-25
New
Approp
2023-25
Estimated
2027-29
Estimated
2029-31
Estimated
2031-33
Estimated
2025-27
Agency
Priority
Current
Expenditures
40000233 Statewide Hatcheries – Domestic Water Systems and Piping 1
001-1 General
Fund-State
10,000 10,000 10,000 10,000 10,000 50,000
057-1 State Bldg
Constr-State
275,000 275,000
325,000 285,000 10,000 10,000 10,000 10,000
Project Total:
40000101 Ringold Hatchery Replace Ponds 2
001-1 General
Fund-State
057-1 State Bldg
Constr-State
200,000 200,000
200,000 200,000
Project Total:
525,000 485,000 10,000 10,000 10,000 10,000
Total: Preservation
Project Class: Program
Project by Account-EA Type
Estimated
Total
Prior
Expenditures
Reapprop
2023-25
New
Approp
2023-25
Estimated
2027-29
Estimated
2029-31
Estimated
2031-33
Estimated
2025-27
Agency
Priority
Current
Expenditures
40000255 Sekiu Boat Ramp Acquisition 3
001-1 General
Fund-State
238,000 238,000 238,000 238,000 238,000 1,190,000
057-1 State Bldg
Constr-State
2,703,000 552,000 760,000 4,015,000
5,205,000 2,941,000 790,000 998,000 238,000 238,000
Project Total:
Total Account Summary
7
*
477 - Department of Fish and Wildlife
OFM
2023-25 Biennium
Ten Year Capital Plan by Project Class
Version: DH WDFW 2024 Supplemental Request
Date Run: 9/27/2023 4:44PM
Report Number: CBS001
Total Account Summary
Estimated
2025-27
Estimated
2031-33
Estimated
2029-31
Estimated
2027-29
Reapprop
2023-25
Prior
Expenditures
Estimated
Total
New
Approp
2023-25
Account-Expenditure Authority Type
Current
Expenditures
001-1 General Fund-State 248,000 248,000 248,000 248,000 248,000 1,240,000
057-1 State Bldg Constr-State 3,178,000 552,000 760,000 4,490,000
3,426,000 800,000 1,008,000 248,000 248,000
Total
5,730,000
8
*
OFM
Ten Year Capital Plan by Project Class
Date Run: 9/27/2023 4:44PM
Report Number: CBS001
Parameter
Agency
Include Enacted
Version
Biennium
User Group
Sort Order
Interpreted AsEntered As
2023-25
477
DH-A
No
Project Class
Agency Budget
2023-25
477
Project Class
Agency Budget
DH-A
No
User Id
* All User Ids
Functional Area
* All Functional Areas
* All Project Classifications
Project Classification
Include Page Numbers
Y Yes
For Word or Excel
N N
9
State of Washington Department of Archaeology & Historic Preservation
P.O. Box 48343 • Olympia, Washington 98504-8343 (360) 586-3065
www.dahp.wa.gov
July 12, 2022
Timothy W. Burns, P.E.
Capital and Asset Management Program Director
Washington Department of Fish and Wildlife
In future correspondence please refer to:
Project Tracking Code: 2022-07-04642
RE: WDFW Capital Budget FY 2023-25
Dear Timothy Burns:
Thank you for contacting the Washington State Department of Archaeology and Historic Preservation
(DAHP). The above referenced project has been reviewed on behalf of the State Historic Preservation
Officer (SHPO) under provisions of Governor’s Executive Order 21-02 (21-02).
Should projects become obligated with Washington State Capital Funding and include ground disturbing
activities, and/or alterations to the interior or exterior of buildings or structures 45 years in age or older,
we will request a related project review form to initiate consultation with DAHP under GEO 05-05. If the
project involves a building or structure 45 years in age or older, we will also require an EZ2 form.
If neither ground disturbing activities nor alterations to a building or structure over 45 years old are related
to a project, consultation with DAHP is not required.
These comments are based on the information available at the time of this review and on behalf of the
SHPO in conformance with 21-02. Also, we appreciate receiving copies of any correspondence or
comments from concerned tribes and other parties that you receive as you consult under the
requirements of 21-02. Should additional information become available, our assessment may be revised.
Thank you for the opportunity to review and comment. Please ensure that the DAHP Project Number
(a.k.a. Project Tracking Code) is shared with any hired cultural resource consultants and is attached to
any communications or submitted reports. If you have any questions, please feel free to contact me.
Sincerely,
Holly Borth
Preservation Design Reviewer
(360) 890-0174
10
No Data Available
FTE Summary - job description and FTE details (CBS 004)
OFM
2023-25 Biennium
Capital FTE Summary
Date Run: 9/27/2023 9:54AM
Report Number: CBS004
Parameter
Agency
Version
Biennium
Include Page Numbers
Interpreted AsEntered As
2023-25
477
32-O
Agency Budget
2023-25
477
Agency Budget
32-O
User Group
N No
For Word or Excel
Y Y
11
FY24 Supplemental Capital Budget Request
Backlog of Projects
Project Title
Budget
Estimate
4-O Ranch - Construct Campground "The Park"
325,000$
4-O Ranch - Wenatchee Creek Trails
85,000$
Arlington Hatchery - Replace Circular Ponds
200,000$
Arlington Hatchery Renovation
12,453,000$
Armstrong Lake Access Ramp
300,000$
Armstrong Lake Access Replace Toilets
65,000$
Asotin Creek WLA - Exterior Repairs to Smoothing Iron Ridge House
85,000$
Asotin Creek WLA - Replace Two Toilets
130,000$
Beaver Creek Hatchery Renovation
31,703,000$
Bellingham Hatchery - Water pipeline modification
200,000$
Big Bend WLA - Construct New Boundary Fence
480,000$
Big Bend WLA - Construct New parking lots
310,000$
Big Bend WLA Debris Removal
35,000$
Bill Clapp Lake access Site
500,000$
Bingham Creek Hatchery - Asphalt Pond Repair
400,000$
Bingham Creek Hatchery - Incubation Supply Line
500,000$
Bingham Creek Hatchery - Rehab Wells
300,000$
Bingham Creek hatchery - Replace Well Supply Line
400,000$
Bingham Creek Hatchery - Upgrade Pollution Abatement Pond
750,000$
Bingham Creek Replace 5 raceways
2,790,000$
Blythe Access Replace Ramp
300,000$
Boat Plank Manufacture and Ramp Replacement (FY23-35)
300,000$
Bob Oke Game Farm - Renovate facilities
250,000$
Bob Oke Game Farm - Ventilation Repairs
125,000$
Bogachiel H Access Road
28,891$
Bogachiel Hatchery - Repairs to Infiltration Area
300,000$
Bogachiel Hatchery - Replace Office Facility
500,000$
Boulder Creek Access Replace Toilets
65,000$
Buzzard Lake Access Area Redevelopment
183,000$
Buzzard Lake Campground ADA Toilet and Parking
65,000$
Caldwell Lake Access Replace Toilets
65,000$
Capitol Way - Renovations to 600 Capitol Way
7,501,000$
Chambers Creek Fishway Repairs
4,613,000$
Chapman Lake DNR Purchase
1,200,000$
Chehalis Unit - Removal of Buildings
100,000$
Chehalis Unit restroom replacement
65,000$
Chehalis Wildlife Area Replace Failing Culverts
325,000$
Chelan Hatchery - Replace existing round ponds with fiberglass
850,000$
Chelan Hatchery Renovation
14,895,000$
Chelan Hatchery Walkway Repairs
65,000$
Chelan WLA - Beebe Springs Bridge Repair
15,000$
Chelan WLA - Beebe Springs Relocate Toilet and Install CXT
65,000$
Chelan WLA - Boundary Surveys
150,000$
Chelan WLA - Butte Sheep/Deer Fencing
600,000$
12
FY24 Supplemental Capital Budget Request
Backlog of Projects
Chelan WLA - Construct WLA Office (prog)
450,000$
Chelan WLA - Lucas Homestead Preservation
150,000$
Chelan WLA - Repair Frank's Pond Outlet Piping
12,000$
Chelan WLA - Road Renovation
250,000$
Chelan WLA - Surveys
45,000$
Chelan WLA - Swakane Pistol and Rifle Range, Phase 2 (FARR Grant match)
225,000$
Chelan WLA - Swakane Residence Renovations
90,000$
Chesaw Wildlife Area Retaining Wall and Concrete Steps
85,000$
Colockum HQ Renovations
350,000$
Colockum Stemilt RMAP & road improvement
400,000$
Colockum WLA - Quilomene Road Assessment
250,000$
Colockum WLA - Quilomene Stock Fence
750,000$
Colockum WLA - Repairs to Little Brushy Creek Crossing
350,000$
Colockum WLA Boundary Fence
750,000$
Colockum WLA Boundary Fence, Game Reserve
300,000$
Columbia Basin Hatchery - Pave Entrance and parking lot
225,000$
Columbia Basin Hatchery - Raceway Replacement
15,508,000$
Columbia Basin WLA - HQ Expansion (Prog)
300,000$
Columbia Basin WLA - Lenore Lake Shooting Range
400,000$
Cooperative Elk Damage Fencing
1,200,000$
County Line Boat Ramp Repair
400,000$
Couse Creek Boat Ramp - Replace Toilet
65,000$
Couse Creek Boat Ramp Repairs
50,000$
Covered Open Storage Area (Ephrata)
250,000$
COVID Facility and Infrastructure Improvements (prog) $ 500,000
Cowlitz Salmon Hatchery - Construct Additional Rearing Pond
18,614,000$
Cowlitz WLA - Rainy Creek Foot Bridge Repair
10,000$
Culvert Case Injunction Fish Passage Barrier Corrections - Chehalis WLA Unit
1,500,000$
Davis Creek - Remove asbestos and interior repairs
50,000$
Davis Creek Koopmans Parking Access Development
185,000$
Deep Lake Access Replace Toilets
75,000$
Deer Lake Dam Repair
450,000$
Delameter Fishways #1 & #2 Repairs
600,000$
Deschutes Watershed Center
41,200,000$
Columbia Basin WLA Desert WLA Building Removal
55,000$
Duckabush Estuary Habitat Restoration
69,726,000$
Duckabush River Access Toilet
50,000$
Dungeness Hatchery - Hatchery Renovation
15,771,000$
Dungeness Hatchery Erosion Control
300,000$
Ebey Island Access Bridge
650,000$
Edar Unit Access Parking and Gates
175,000$
Eells Springs Renovation
20,049,000$
Electrical and Standby Generator (FY23-25)
750,000$
Elochoman Hatchery - Facility Abandonment
3,816,000$
Elochoman Hatchery - Remove Hatchery Intake (State match)
500,000$
13
FY24 Supplemental Capital Budget Request
Backlog of Projects
Elochoman Weir Live Box re-build
400,000$
Elwha Hatchery - Power to Spawning Area
100,000$
Elwha Hatchery - Recondition All Wells
375,000$
Elwha Hatchery - Renovation
13,167,000$
Elwha Hatchery - Repair Asphalt Parking Lot
400,000$
Elwha Hatchery - Replace Residence
350,000$
Equipment Storage Building Replacement, Statewide
500,000$
EV Charging Stations - Statewide Locations
450,000$
Evergreen Jobs
6,254,000$
Facility Safety Deficiencies (FY23-25)
600,000$
Fallert Creek Hatchery - Incubation Supply Line
375,000$
Fallert Creek Hatchery - Replace Intakes, Ponds and Pollution Abatement Pond
16,587,000$
Fallert Creek Hatchery Residence Replacement
500,000$
Fan Lake - Toilet Replacement
65,000$
Fish & Wildlife Health and Biosecurity Facility (Major Project)
7,805,000$
Fish Culture Improvements (FY23-35)
900,000$
Fish Marking Trailer Storage
1,000,000$
Fishtrap Lake Access Replace Toilets
65,000$
Fitzsimmons Access Toilet Replacement (1)
65,000$
Ford Hatchery - ADA Access
250,000$
Ford Hatchery - Renovate Intake, Ponds, and Outfall
27,565,000$
Forest Health - Hazard Fuel Reduction
37,000,000$
Forks Creek Hatchery - Raceway Replacement and Supply Pipeline
6,428,000$
Forks Creek Hatchery Siphon Intake Removal - Phase 4
1,256,000$
Garrison Springs Hatchery Renovate Fishway
850,000$
General Energy Efficiency Improvements (FY23-25)
750,000$
George Adams Hatchery - Replace Adult Ponds and Raceways
12,160,000$
Goldendale Hatchery - Remodel RAS
14,743,000$
Goldendale Hatchery - Replace Raceway & Pipeline and Improve Rearing Capacity
6,193,000$
Habitat at Home
1,000,000$
Hand Access Ramp
480,000$
Harts Lake Access Replace Toilets
65,000$
Hatch Lake Access Replace Toilets
65,000$
Hatchery access & onsite road upgrade
500,000$
Hatchery Electrical Service Improvements for Automated Marking Trailers
500,000$
Heart Access Ramp
300,000$
Hoffstadt Hills Habitat Acquisition
14,500,000$
Hog Lake Toilet Replacement
65,000$
Hood Canal Shellfish Harvest Access Opportunity
3,000,000$
Hoodsport Hatchery Pond 14 Replacement
1,438,000$
Hoodsport Hatchery Renovate Intake
6,736,000$
Horseshoe Lake - Replace Vault Toilet
65,000$
Horseshoe Lake Access Replace Vault Toilets
80,000$
Hovander Boat Ramp (Ferndale)
300,000$
Humptulips Hatchery - Repair Water Supply Line
400,000$
14
FY24 Supplemental Capital Budget Request
Backlog of Projects
Humptulips Hatchery - Replace Ponds and Pipeline
15,296,000$
Humptulips Hatchery - Replace River Intake Pumps
500,000$
Hupp Springs Hatchery Renovate Intake Diversion
300,000$
Indian George Access Redevelopment
300,000$
Issaquah H Viewing Platform
30,000$
Issaquah Hatchery Gravity Pipeline Replacement
2,737,000$
John's River Shop Maintenance and Repairs. (Leaking Roof, etc.)
50,000$
John's River WLA - Elk River Unit wetland Enhancement and culvert repairs.
300,000$
Joseph Creek WLA - Repairs to Bank and Access Road
300,000$
Judson Lake Lead Shot Remediation
800,000$
Jump Off Joe Lake Access Replace Toilets
65,000$
Kalama Falls Hatchery - Renovate Fish Passage Barrier
200,000$
Kalama Falls Hatchery - Renovate Intakes
150,000$
Kalama Falls Hatchery - Replace Raceways and PA System (Construction)
11,579,000$
Kalama Hatchery - Replace Sand Filters
500,000$
Kendall Creek Hatchery - Raceway Replacement (9 series)
750,000$
Kendall Creek Hatchery - Raceway Replacement (Pond 3)
800,000$
Kendall Creek Hatchery - Relocate Entrance
550,000$
Kendall Creek Hatchery - Replace Gravity and Pumped Intakes
9,265,000$
Kendall Creek Hatchery - Replace Incubation Pipeline
525,000$
Kendall Creek Hatchery - Replace PA Pond
500,000$
Kendall Creek Hatchery - Replace Water Distribution Tower and Pipeline
500,000$
Kendall Creek Hatchery - Water Supply Line Repairs $ 525,000
Kendall Creek Hatchery Incubation Room Rebuild
400,000$
Kendall Creek Hatchery Well Redevelopment
350,000$
Klickitat WLA - New Parking Areas on Simcoe Unit
120,000$
Klickitat WLA - Replace KWA Shop Building Posts
80,000$
Klickitat WLA Simcoe Unit RMAP
470,000$
Klickitat WLA Soda Springs Unit - Demolish Hay Barn
15,000$
Kress Lake Trail Repairs
110,000$
Lacey Shop - Electrical Replacement & Upgrade $ 125,000
Lacey Shop - Energy Efficiency Upgrades
75,000$
Lacey Shop - Fabrication Shop Roof & Gutter Replacement
125,000$
Lacey Shop - Pump Shop Crane System
75,000$
Lacey Shop - Security Improvements to Facilities and Compound $ 50,000
Lacey Shop - Siding Replacement
300,000$
Lake Aberdeen Hatchery - Replace Storage Shed
100,000$
Lake Aberdeen Replace T-Dock
160,000$
Lake Serene Access Replace Toilets
65,000$
Lake Sixteen Access Replace Toilets
65,000$
Lake Stickney Toilet Replacement
65,000$
Lakewood Hatchery and WLA - Construct 4-6 Bay Storage Building
650,000$
Lakewood-Spring Water Aeration System
100,000$
Lathrop Road Compound - Covered Storage for Fish Program Boats
1,603,000$
Lathrop Road Compound - Covered Storage for RVs and Boat
203,000$
Lily Lake Public Access Development
290,000$
Lower Valley Access Site Development
850,000$
15
FY24 Supplemental Capital Budget Request
Backlog of Projects
LT Murray WLA - Green Gate & Naneum Road Rec Plan Implementation
100,000$
LT Murray WLA - Install Barriers
150,000$
LT Murray WLA - Watt Covered Hay Storage
150,000$
Marblemount Hatchery - Renovation
23,192,000$
Marblemount Hatchery - Security Gate
50,000$
Marblemount Hatchery - Water Supply Pipeline Repair
800,000$
Marblemount Hatchery Bird Netting
75,000$
Marblemount Hatchery Residence Replacement
500,000$
Marblemount Hatchery Septic Repair - FSD
200,000$
Marshall Lake Access Replace Toilets
65,000$
Mayfield Lake - Construct New Net Pens
400,000$
Mayr Brothers Hatchery - Replace Intake and Renovate Fishway
2,573,000$
McDonald Road Access Dike Setback and Riparian Restoration
850,000$
McFarland Creek Toilet Replacement
65,000$
McKernan Hatchery Renovate Adult Pond
5,987,000$
Methow Forest Restoration Phase 3
300,000$
Methow Wildlife Area Boulder Creek and Chewuch River Campgrounds
650,000$
Methow WLA - Rendezvous Unit Fencing
87,000$
Methow WLA - Renovations to Storage Barn
105,000$
Methow WLA - Replace HQ Office
450,000$
Methow WLA - Wolf Canyon Fencing
655,000$
Methow WLA Fencing
745,000$
Milltown Island Estuary Restoration, Phase 2
7,233,000$
Mineral Lake Lower Parking Lot Repair (Access)
200,000$
Minter Creek Hatchery - Replace Intake
10,618,316$
Modrow Trap - Purchase adjacent Property
Morgan Marsh Parking Area Development
85,000$
Morse Creek Unit House Removal
40,000$
Mossyrock Hatchery - Construct Additional Intake
720,000$
Mossyrock Hatchery - Replace Ponds
Mt St Helens WLA - Alder Creek Stream Restoration
140,000$
Mt St Helens WLA - Fencing at Cedar Creek
120,000$
Mt St Helens WLA - Foot bridge and stairs for Merrill Lake
200,000$
Mt St Helens WLA - Oneida Increased Parking Capacity
450,000$
Naches Hatchery - Roof Repairs
45,000$
Naches Hatchery - Security Fencing - FSD
100,000$
Naches Hatchery - Water Supply Development
3,402,000$
Naselle Hatchery Renovation
41,837,000$
Nemah Hatchery - Bridge Replacement
1,608,000$
Nemah Hatchery - Facility Upgrade
15,814,000$
Nemah Hatchery Pipeline Replacement
750,000$
Nemah Public Access Parking Area
400,000$
Nisqually Unit Facility Pier and Foundation Repair
200,000$
Nooksack Unit Culverts Replacement
250,000$
North Olympic WLA - Bell Creek Unit Pond Development
350,000$
North Potholes Wetland Restoration
600,000$
North Toutle Hatchery - Renovation
29,849,000$
16
FY24 Supplemental Capital Budget Request
Backlog of Projects
NRB Consolidation and Re-configuration
850,000$
Oak Creek WLA - Cowiche boundary fence
150,000$
Oak Creek WLA - Cowiche Haybarn and Feedsite Access Road Improvements
400,000$
Oak Creek WLA - Cowiche Mill Rd Elk Cattle Guard Installation
200,000$
Oak Creek WLA - Irrigation Efficiencies
125,000$
Oak Creek WLA - NF Cowiche Road Improvements
300,000$
Oak Creek WLA - Office Renovation
200,000$
Oak Creek WLA - Repairs to Junction Road and Elk Fencing
75,000$
Oak Creek WLA - Residence and Shop Sidewalk Repairs
125,000$
Oak Creek WLA - Road Renovation Project
450,000$
Oak Creek WLA - Shop Replacement
300,000$
Oak Creek WLA - Upgrades to Cowiche Road and Bridge
700,000$
Oak Creek WLA - Visitor Center and Viewing Area Improvement
275,000$
Oak Creek WLA RMAP
200,000$
Okanogan County Shrub Steppe Restoration
500,000$
Okanogan District Office
1,000,000$
Okanogan Irrigation
500,000$
Olympia Tumwater Foundation Visitor Center
2,000,000$
Omak Hatchery Compound Security Enclosure
250,000$
Omak Hatchery Storage Building
120,000$
Palmer Rearing Pond - Install Stairs
80,000$
Panther Lake Access Replace Toilets
65,000$
Pateros Unit Boundary Fence Replacement
750,000$
Patterson Lake Toilet Replacement
65,000$
Pearrygin Lake Toilet Replacement
65,000$
Pier 86 Renovation, Seattle
11,630,000$
Pipestone Canyon Trail Improvements
250,000$
Point No Point Boat Launch
950,000$
Pond 3 Replace Vault Toilet
65,000$
Ponds 1 & 2 Access Replace Vault Toilets
80,000$
Pumps and Alarms (FY23-25) $ 750,000
Pygmy Rabbit Habitat Enhancement
250,000$
Quincy Lake Access Ramp
300,000$
Quincy Lakes Unit Trails Planning
200,000$
Rapjohn Lake Access Replace Toilets
65,000$
Region 1 - Replace Fiberglas Toilets (6 locations)
450,000$
Region 1 Office Construct Secure Storage Compound
9,827,000$
Region 2 Facility Renovations/Improvement
325,000$
Region 2 HQ Covered Storage Area
300,000$
Region 3 Access Site Security
100,000$
Region 3 Ponds 4&5 Phase 2
350,000$
Region 3 Road Management Improvements
125,000$
Region 4 HQ Mill Creek Consolidation
15,451,000$
Region 4 Water Access Shop/Storage
150,000$
Region 6 - Exterior Operational Storage & Parking Expansion $ 2,500,000
Region 6 - HQ Facility Renovations $ 1,500,000
17
FY24 Supplemental Capital Budget Request
Backlog of Projects
Region 6 - Replace Fiberglas Toilets (7 locations)
455,000$
Regional Offices - Re-paving and Pavement Repairs to Parking Lots
700,000$
Regional Offices - Repairs to Regional/District Facilities
500,000$
Regional Offices - Replace and Improve Exterior Lighting
250,000$
Regional Offices - Security Improvements
250,000$
Reiter Ponds Hatchery - Replace Intake and Piping
1,848,000$
Ringold Hatchery - Replace Ponds
4,952,000$
Rock Lake Access Site - Replace toilet
65,000$
Rustlers Gulch -Replace Toilets
130,000$
Sacheen Lakes - Access Site Paving
100,000$
Samish Hatchery - Friday Creek Intake and Fish Passage
10,948,000$
Samish Hatchery - Incubation Room Replacement
350,000$
Samish Hatchery - Repairs to Friday Creek Intake Road
800,000$
Samish Hatchery - Security Gate
50,000$
Samish Unit - Replace Equipment Storage Barn
400,000$
Scatter Creek Bridge
250,000$
Scatter Creek WLA - Improvements to Parking Access
40,000$
Scotch Creek Wildlife Area Building Removal
15,000$
Scotch Creek Wildlife Area Correct Diversion
65,000$
Scotch Creek Wildlife Area Irrigation Efficiencies
65,000$
Scotch Creek Wildlife Area Wetland Control Structure
125,000$
Scotch Creek WLA - Boyce Barn Replace Siding
125,000$
Scotch Creek WLA - Renovate and Expand HQ Office (Prog)
125,000$
Scotch Creek WLA - Residence and Barn painting
75,000$
Scotch Creek WLA Building Removal
35,000$
Scotch Creek WLA Correct Diversion
250,000$
Scotch Creek WLA Irrigation Efficiencies
300,000$
Scotch Creek WLA Wetland Control Structure
300,000$
Seep Lakes Road Reconstruction (Adams County)
245,000$
Sekiu Boat Ramp Acquisition and Development
2,684,000$
Shady Lake Access Replace Toilets
65,000$
Sherman Creek WLA Replace Diversion
150,000$
Shilllapoo Lakebed Enhancement Project
3,000,000$
Shipherd Falls Fishway Access (Wind River)
150,000$
Silver Lake Ramp and Dock Replacement (Access)
500,000$
Sinlahekin Creek WLA Replace Diversion
300,000$
Sinlahekin WLA - Alternative Energy and Backup System
75,000$
Sinlahekin WLA - Okanogan Subbasin Culvert
250,000$
Sinlahekin WLA - Renovations to Woodshop
100,000$
Sinlahekin WLA - Repairs to Residence
125,000$
Sinlahekin WLA Fence Removal, Construction and/or Repair
625,000$
Sinlahekin WLA Renovate Wildlife Viewing Blinds
45,000$
Sinlahekin WLA Trails Renovation
250,000$
Sixteen Lake Access Toilet Replacement
65,000$
Skagit Wildlife Area - Fir Island Farm Unit Toilet Installation
70,000$
Skagit WLA - Big Ditch Water Access Site Redevelopment
400,000$
Skagit WLA - Covered Storage Building for No. Sound Weed Crew
100,000$
18
FY24 Supplemental Capital Budget Request
Backlog of Projects
Skagit WLA - Repairs to Dike and Drainage (FY23-25)
500,000$
Skagit WLA - Shop Renovation
125,000$
Skamania Hatchery - Renov Adult Trapping, Holding and Spawning Facilities
5,479,000$
Skookumchuck - Install Toilet
65,000$
Snow Creek Resort - Reconstruct Facility
8,203,000$
Sol Duc Hatchery - Ponds Renovation
13,869,000$
Sol Duc Pump Intake Barrier and Boat Chute
4,730,000$
Sol Duc Rebuild Drain System -FCI
10,000$
Soos Creek Hatchery - Construct Phase 3
4,100,000$
South Fork Newaukum ASRP Early Action Plan
4,500,000$
South Lake Whatcom - Intake Modification
700,000$
South Montesano--Stabilization and replacement parking
500,000$
South Puget Sound Grassland and Oak Restoration
465,000$
South Puget Sound WLA - Boat Washing Facility
250,000$
South Puget Sound WLA - Boundary Security Fence Improvements
750,000$
South Puget Sound WLA Unit - Secure Compound w/ Covered Equipment Storage
and Workshop
650,000$
South Region 1 - Replace Failing Concrete Toilets
750,000$
Southern Resident Killer Whale Master Plan, Phase 2
250,000$
Spears Bridge - Remove Vehicle Bridge
65,000$
Spokane Hatchery Renovation
56,046,000$
Spud House Boat Ramp
300,000$
Squalicum Lake Access Replace Toilets
65,000$
SRKW - Beaver Creek Hatchery Expansion
10,696,000$
SRKW - Bogachiel Hatchery Expansion
16,106,000$
SRKW - Coulter Creek Hatchery Expansion
4,103,000$
SRKW - Dungeness Hatchery Expansion
24,994,000$
SRKW - Elwha Hatchery Expansion
11,190,000$
SRKW - Humptulips Hatchery Renovation
15,017,000$
SRKW - Hupp Springs Hatchery Expansion
9,515,000$
SRKW - Lyons Ferry Hatchery Expansion
23,643,000$
SRKW - Marblemount Hatchery Expansion
11,444,000$
SRKW - McKernan Hatchery Expansion
4,863,000$
SRKW - Naselle Hatchery Expansion
11,954,000$
SRKW - Nemah Hatchery Expansion
9,056,000$
SRKW - New Cowlitz River Hatchery
38,786,000$
SRKW - Palmer Ponds Expansion
4,792,000$
SRKW - Puyallup Hatchery Expansion
5,985,000$
SRKW - Samish Hatchery Expansion and Adult Pond Renovation
12,971,000$
SRKW - Sol Duc Hatchery Modifications
9,894,000$
SRKW - Wallace River Hatchery Expansion
9,125,000$
SRKW - Whitehorse Hatchery Expansion
10,446,000$
Statewide ADA Improvements
500,000$
Statewide Bridge Safety Repairs $ 525,000
Statewide Building Debris Removal
125,000$
Statewide Building Demolition
150,000$
Statewide Building Repairs (nonhatchery) $ 500,000
19
FY24 Supplemental Capital Budget Request
Backlog of Projects
Statewide Dam Safety Repairs (FY23-25)
625,000$
Statewide Exterior Building Repairs
300,000$
Statewide Facilities - Install Energy Efficient Exterior Lighting
250,000$
Statewide Facility Paving Repairs
500,000$
Statewide Facility Repairs
500,000$
Statewide Fish Barrier Repairs
300,000$
Statewide Fishway Repairs
500,000$
Statewide Hatcheries - Asphalt Pond Repairs
800,000$
Statewide Hatcheries - Building Repairs
500,000$
Statewide Hatcheries - Building Replacements
400,000$
Statewide Hatcheries - Domestic Water Systems & Piping
960,000$
Statewide Hatcheries - General Energy Efficiency Improvements
300,000$
Statewide Hatcheries - Intake and water supply modify/repair/replace
500,000$
Statewide Hatcheries - Predator Prevention Measures (FY23-35) $ 400,000
Statewide Hatcheries - Residence Repairs (FY23-25) $ 500,000
Statewide Hatcheries - Residence Replacements (FY23-25) $ 900,000
Statewide Hatcheries - Roof Repair/Replace
600,000$
Statewide Network Rebuild
600,000$
Statewide Roof Replacement
300,000$
Statewide Signage and Interpretive Signs
650,000$
Statewide Toilet Replacement (FY23-25)
600,000$
Statewide Wildlife Area Fencing
500,000$
Stinson Flats Access Site - Rebuild Boat Ramp
550,000$
Storm Lake Access Replace Toilets
65,000$
Sunnyside WA Irrigation Efficiencies Mesa, Ruply, Snipes
675,000$
Sunnyside WLA - Lift Pump Infrastructure Replacement
100,000$
Sunnyside WLA - Vance Ferry Unit Building Demolition
250,000$
Swanson Lakes - Construct Bunkhouse
250,000$
Swanson Lakes - Entry Road Paving
100,000$
Swanson Lakes - Replace toilets
65,000$
Tanwax Lake Access Replace Toilets
60,000$
Tokul Creek Hatchery - Replace Raceway, Water Supply, Drains
8,040,000$
Toutle Fish Collection Facility Upgrade with ASACE
20,030,067$
Trout Creek Ford Replacement
200,000$
Twin Lakes Toilet Replacement
26,000$
Underground Storage Tank Remediation $ 300,000
Upgrade and replace Deep River Net Pens
2,000,000$
Vancouver Hatchery - Repair Pond 13
400,000$
Violet Prairie Public Access Development
500,000$
Volger Lake Access Replace Toilets
65,000$
W Medical Lake Access 2 Separate Single Ramps
300,000$
W Medical Lake Access Replace Toilets
65,000$
W.F. Teanaway River Restoration (Mile 5.8 & River Mile 6.0)
250,000$
Wallace River Hatchery - Replace Intakes and Ponds
45,469,000$
Washougal H Building Lighting-FSD
50,000$
Washougal Hatchery - Rehab Adult Handling Facility
6,402,000$
Washougal Hatchery - Repair Diversion Dam Sinkhole
100,000$
20
FY24 Supplemental Capital Budget Request
Backlog of Projects
Washougal Hatchery - Replace Raceways and Pipeline
14,274,000$
Water Right Compliance/Flow Meters
300,000$
Wells WLA - Bridgeport Bar Unit Irrigation Pump Replacement
300,000$
Wells WLA - Bunkouse Upgrade
50,000$
Wells WLA, Central Ferry Unit - Crane Property Fence Installation
160,000$
Wenas WLA - Equipment Shed Enhancements
125,000$
Wenas WLA - Mt Vale Electrical Upgrades
125,000$
Wenas WLA - Target Shooting Range, Phase 2
750,000$
Wenas WLA -Irrigation Efficiencies (Mtn Vale and McCabe)
65,000$
Wenas WLA Evans Canyon Fire Elk Fence Replacement
4,833,000$
Wenas WLA Road Improvements
55,000$
Wenas WLA Shop enhancements/additional enclosed buildings
500,000$
West Rocky Prairie--Redevelop Parking Access Area.
300,000$
Western WA Coastal Lab Facility
1,500,000$
Western WA Flood Reduction (Region 6 screens)
350,000$
Whatcom WLA Lake Terrell Unit - Pheasant Pen Repairs
250,000$
Whatcom WLA Pine & Cedar Units - Boardwalk Improvements
125,000$
Whiskey Dick Wildlife Area Road Renovation
200,000$
Whitehorse Hatchery - Replace Vault Toilet
65,000$
Wiatts Lake - Access Site Paving
100,000$
Willapa Bay Lab - Replace Pump House
50,000$
Windmill Access Ramp
300,000$
Wiser Lake Access Replace Toilets
65,000$
Wooten Wildlife Area - Improve Flood Plain
27,006,000$
Wooten WLA - Construct Pole Building
75,000$
Wooten WLA - Old Campground 9
25,000$
Wooten WLA - Replace Siding on Office and Garage
100,000$
Wooten WLA - Repr/Rpl gutters on WLA HQ building
50,000$
Yakima Construction Shop Exterior Repairs
250,000$
Yakima Enforcement Building
900,000$
Yakima Shop - Covered Storage Building & Asphalt
250,000$
Yakima Shop - Heating Sys & Repaint Exterior w/repair
150,000$
Total
1,263,620,274$
21
TAB B – All Preservation Projects
22
477 - Department of Fish and Wildlife
2023-25 Biennium
Capital Project Request
OFM
Version: DH WDFW 2024 Supplemental Request
Project Number:
40000233
Date Run: 9/27/2023 12:05PM
Report Number: CBS002
Statewide Hatcheries – Domestic Water Systems and Piping
Project Title:
Project Class:
Preservation
Description
Starting Fiscal Year:
2024
1
Agency Priority:
Domestic water is used at hatcheries to supply potable water to residences, offices, workspaces and in some locations for
fish production. Examples of projects identified in this category include replacing old and deteriorating waterlines and
treatment systems at several hatcheries. The supplemental ask would support the repiping and updating of 6-9 residences
at locations such as Aberdeen Hatchery, Mossyrock Hatchery, and possibly other sites.
Project Summary
Project Description
1. Identify the problem or opportunity addressed. Why is this request a priority? This narrative should identify
unserved/underserved people or communities, operating budget savings, public safety improvements or other backup
necessary to understand the need for the request. For preservation projects, it is helpful to include information about the
current condition of the facility or system.
Much of the hatchery infrastructure is over 40 years old and a number of domestic waterlines are failing. Investing in the
hatchery infrastructure requirements will ensure hatchery staff and their families have clean and safe drinking water improve
the overall quality of life at the hatchery complex.
2. What will the request produce or construct (i.e., predesign or design of a building, construction of additional space, etc.)?
When will the project start and be completed? Identify whether the project can be phased, and if so, which phase is included
in the request. Be prepared to provide detailed cost backup.
The request will replace old and failing domestic water lines at residences and workspaces. Investing in the hatchery
infrastructure requirements will ensure hatchery staff and their families have clean and safe drinking water improve the
overall quality of life at the hatchery complex. These projects are all at and on existing hatchery facilities and all within the
existing developed hatchery footprint.
3. How would the request address the problem or opportunity identified in question 2? What would be the result of not
taking action?
We could bein violation of Department of Health drinking water standards for agency staff. Creating an unsafe living and
working environment.
4. What alternatives were explored? Why was the recommended alternative chosen? Be prepared to provide detailed cost
backup. If this project has an associated predesign, please summarize the alternatives the predesign considered.
N/A
5. Which clientele would be impacted by the budget request? Where and how many units would be added, people or
communities served, etc.
N/A
6. Does this project leverage non-state funding? If yes, how much by source? If the other funding source requires cost
share, also include the minimum state (or other) share of project cost allowable and the supporting citation or
documentation.
N/A
23
477 - Department of Fish and Wildlife
2023-25 Biennium
Capital Project Request
OFM
Version: DH WDFW 2024 Supplemental Request
Project Number:
40000233
Date Run: 9/27/2023 12:05PM
Report Number: CBS002
Statewide Hatcheries – Domestic Water Systems and Piping
Project Title:
Project Class:
Preservation
Description
7. Describe how this project support the agency’s strategic master plan or how would it improve agency performance.
Reference feasibility studies, master plans, space programming and other analyses as appropriate.
N/A
8. Does this decision package include funding for any Information Technology related costs including hardware, software
(to include cloud-based services), contracts or staff? If yes, complete the IT Addendum (available upon request).
N/A
9. Is this project linked to Puget Sound Partnership’s “Puget Sound Action Agenda”? If yes, please describe the impacts
on the Action Agenda, including expenditure and FTE detail.
N/A
10. Does this project contribute to statewide goals to reduce carbon pollution and/or improve energy efficiency? If yes,
please elaborate.
N/A
11. How is this project impacting equity in the state? Which communities are impacted by this project? Include both
demographic and geographic communities. How are disparities in communities impacted?
N/A
12. Will the project increase or decrease annual operating costs? If yes, please explain.
Depending on systems there is likely to be an increase to the operation and maintenance of the systems estimated at $5000
per year.
13. Is there additional information you would like decision makers to know when evaluating this request?
N/A
Location
City: Statewide County: Statewide Legislative District: 098
Project Type
Facility Preservation (Minor Works)
Health, Safety and Code Requirements (Minor Works)
Infrastructure Preservation (Minor Works)
Growth Management impacts
There are no growth management impacts
Funding
Expenditures
2023-25 Fiscal Period
24
477 - Department of Fish and Wildlife
2023-25 Biennium
Capital Project Request
OFM
Version: DH WDFW 2024 Supplemental Request
Project Number:
40000233
Date Run: 9/27/2023 12:05PM
Report Number: CBS002
Statewide Hatcheries – Domestic Water Systems and Piping
Project Title:
Project Class:
Preservation
Funding
Account Title
Estimated
Total
Prior
Biennium
Current
Biennium
Reapprops
New
Approps
Acct
Code
001-1 50,000 10,000 General Fund-State
057-1 275,000 275,000 State Bldg Constr-State
325,000 0 0 0 285,000
Total
2025-27 2027-29 2029-31 2031-33
Future Fiscal Periods
001-1 10,000 10,000 10,000 10,000
General Fund-State
057-1
State Bldg Constr-State
10,000 10,000 10,000 10,000
Total
Operating Impacts
No Operating Impact
Narrative
These funds will be used to replace and repair structures and infrastructure and reduce the agency's deferred maintenance
backlog.
25
477 - Department of Fish and Wildlife
2023-25 Biennium
Capital Project Request
OFM
Version: DH WDFW 2024 Supplemental Request
Project Number:
40000101
Date Run: 9/27/2023 12:05PM
Report Number: CBS002
Ringold Hatchery Replace Ponds
Project Title:
Project Class:
Preservation
Description
26
477 - Department of Fish and Wildlife
2023-25 Biennium
Capital Project Request
OFM
Version: DH WDFW 2024 Supplemental Request
Project Number:
40000101
Date Run: 9/27/2023 12:05PM
Report Number: CBS002
Ringold Hatchery Replace Ponds
Project Title:
Project Class:
Preservation
Description
Starting Fiscal Year:
2024
2
Agency Priority:
The Ringold Hatchery has several renovation projects in the 10-year plan. To help minimize fish loss and ensure production
goals are met for several species, 14 crumbling vinyl raceways at Ringold Springs Hatchery need to be replaced. The project
plan involves removing the raceways, which were originally considered temporary when installed more than 50 years ago
and replacing them with 16 fiberglass circular tanks (30 feet diameter by 5 feet deep) – the equivalent rearing volume as the
current raceways. An agricultural metal building with bird predation netting would need to be constructed, and intake and
drain systems would need to be re-designed to accommodate the new tanks. There is an emergent need to rehabilitation
and line the rearing ponds, and there is an upcoming need to expand the adult collection capabilities of the site. In order to
best make cost effective design decisions and make sure we are addressing the most critical components first; a pre-design
is necessary to see the whole design picture.
Project Summary
Project Description
1. Identify the problem or opportunity addressed. Why is this request a priority? This narrative should identify
unserved/underserved people or communities, operating budget savings, public safety improvements or other backup
necessary to understand the need for the request. For preservation projects, it is helpful to include information about the
current condition of the facility or system.
The vinyl raceways at the facility have far exceeded their lifespan and require lengthy and repairs routinely. The vinyl liners are
torn, and the steel and wood support structures are rotten. Currently these raceways are used for intermediate rearing of
steelhead, tiger muskies and rainbow fry. They may also be needed for rearing spring Chinook salmon as part of an effort to
help recover Puget Sound’s southern resident killer whale population, which is listed for protection under the federal
Endangered Species Act. Replacing the dilapidated structures would greatly reduce the likelihood of fish loss and help
ensure production goals for fish species are met. There is a critical need to address pathological issue in the rearing pond
and to evaluate the design options to best control disease in the rearing ponds. Without that improvement fish health may be
compromised.
2. What will the request produce or construct (i.e., predesign or design of a building, construction of additional space,
etc.)? When will the project start and be completed? Identify whether the project can be phased, and if so, which phase
is included in the request. Be prepared to provide detailed cost backup.
The supplemental request will produce background design data, consideration of costs and design options in a complete
report of preferred design options, cost estimates, and preliminary site plans.
There would have to be close coordination with hatchery staff to allow the facility to manage production during this project.
This may require moving fish to another facility until the project is complete.
3. How would the request address the problem or opportunity identified in question 2? What would be the result of not
taking action?
A predesign report would best prepare us for a rapid design bid build pathway to be able to address a thoughtful and effective
renovation to a critical hatchery.
4. What alternatives were explored? Why was the recommended alternative chosen? Be prepared to provide detailed
cost backup. If this project has an associated predesign, please summarize the alternatives the predesign considered.
This is a request for a predesign approach and would consider and evaluate multiple options for all future phases. For
instance, to replace the 14 vinyl raceways with 14 concrete raceways and no bird predation netting, which has an estimated
27
477 - Department of Fish and Wildlife
2023-25 Biennium
Capital Project Request
OFM
Version: DH WDFW 2024 Supplemental Request
Project Number:
40000101
Date Run: 9/27/2023 12:05PM
Report Number: CBS002
Ringold Hatchery Replace Ponds
Project Title:
Project Class:
Preservation
Description
cost of $3.8 million dollars. The estimated cost of replacing the vinyl raceways with fiberglass circular tanks and the addition
of an agricultural metal building and bird predation netting is $2.3 million dollars.
5. Which clientele would be impacted by the budget request? Where and how many units would be added, people or
communities served, etc.
Production at Ringold Springs Hatchery supports recreational fisheries that attract anglers throughout the state. These
opportunities include trophy tiger muskie fisheries at several Washington lakes, a couple of lowland lake trout fisheries, and
the region’s only hatchery steelhead fishery, which occurs in the Hanford Reach of the Columbia River. In addition, the
potential for spring Chinook production could help with the effort to recover Puget Sound’s federally protected southern
resident killer whale population.
6. Does this project leverage non-state funding? If yes, how much by source? If the other funding source requires cost
share, also include the minimum state (or other) share of project cost allowable and the supporting citation or
documentation.
No, the steelhead smolt program is funded by Mitchell Act. However, there is insufficient MA funding for capital improvements
needed to sustain that program into the future. State capital funds are required.
7. Describe how this project support the agency’s strategic master plan or how would it improve agency performance.
Reference feasibility studies, master plans, space programming and other analyses as appropriate.
The agency’s strategic plan goal #2 states: Provide sustainable fishing, hunting and other wildlife-related recreational
experiences. This project allows hatchery staff to meet those goals by continuing to support the Hanford Reach steelhead
and statewide tiger muskie fisheries well into the future.
8. Does this decision package include funding for any Information Technology related costs including hardware, software
(to include cloud-based services), contracts or staff? If yes, complete the IT Addendum (available upon request).
N/A.
9. Is this project linked to Puget Sound Partnership’s “Puget Sound Action Agenda”? If yes, please describe the impacts
on the Action Agenda, including expenditure and FTE detail.
N/A.
10. Does this project contribute to statewide goals to reduce carbon pollution and/or improve energy efficiency? If yes,
please elaborate.
No.
11. How is this project impacting equity in the state? Which communities are impacted by this project? Include both
demographic and geographic communities. How are disparities in communities impacted?
It is expected that there are few, if any, disproportionate impacts from this proposal. However, if this proposal does not
receive funding, there could be disproportionate impacts to those who rely on hatchery fish for their subsistence, economic
welfare, and recreation if hatchery fish become ill and WDFW does not have enough staff to thoroughly address the issue.
28
477 - Department of Fish and Wildlife
2023-25 Biennium
Capital Project Request
OFM
Version: DH WDFW 2024 Supplemental Request
Project Number:
40000101
Date Run: 9/27/2023 12:05PM
Report Number: CBS002
Ringold Hatchery Replace Ponds
Project Title:
Project Class:
Preservation
Description
There is a strong possibility of disproportional impacts if this proposal isn’t funded as WDFW has recently been having
trouble filling contract positions for fin clipping. When that happens, there are less fish available for tribal fishing, along with
commercial and recreational fishing. Funding this proposal will help ensure tribal treaty rights, subsistence fishing, and
protect treaty resources.
Rural and geographically isolated communities in Washington will significantly benefit from the economic opportunities in
commercial fishing.?Recreational ?shing opportunities throughout the state contribute signi?cant revenue to rural
businesses.? Tribal fisheries will benefit from the continued production of healthy hatchery fish from well-maintained
facilities.
12. Will the project increase or decrease annual operating costs? If yes, please explain.
Annual operating costs are estimated to increase $1000 per year beginning in FY25.
13. Is there additional information you would like decision makers to know when evaluating this request?
Ringold Springs Hatchery does not have alternative rearing vessels for the programs that we use the vinyl raceways for, so it
is imperative that they upgraded.
Location
City: Mesa County: Franklin Legislative District: 009
Project Type
Infrastructure (Major Projects)
Growth Management impacts
There are no growth management impacts
Funding
Account Title
Estimated
Total
Prior
Biennium
Current
Biennium
Reapprops
New
Approps
Acct
Code
Expenditures
2023-25 Fiscal Period
001-1 General Fund-State
057-1 200,000 200,000 State Bldg Constr-State
200,000 0 0 0 200,000
Total
2025-27 2027-29 2029-31 2031-33
Future Fiscal Periods
001-1
General Fund-State
057-1
State Bldg Constr-State
0 0 0 0
Total
Operating Impacts
No Operating Impact
29
2023-25 Biennium
Capital Project Request
OFM
Parameter
Agency
Capital Project Number
Project Classification
Version
Biennium
Include Page Numbers
Sort Order
Entered As
2023-25
477
DH-A
1
*
Project Class
Agency Budget
Interpreted As
2023-25
477
1
Project Class
Agency Budget
All Project Numbers
DH-A
All User Ids*
User Id
User Group
No
N
For Word or Excel
N N
30
TAB C – All Programmatic Projects
31
477 - Department of Fish and Wildlife
2023-25 Biennium
Capital Project Request
OFM
Version: DH WDFW 2024 Supplemental Request
Project Number:
40000255
Date Run: 9/27/2023 11:59AM
Report Number: CBS002
Sekiu Boat Ramp Acquisition
Project Title:
Project Class:
Program
Description
Starting Fiscal Year:
2025
3
Agency Priority:
With this request, Washington Department of Fish and Wildlife (WDFW) proposes to purchase approximately 2.5 acres of
uplands, tidelands, and an easement for ingress/egress, including a four-lane boat ramp and two parking lots, from a private
fishing resort in Sekiu, Clallam County. This property purchase will provide the only public boat ramp for saltwater fishing and
recreational boating access to the Strait of Juan de Fuca between Port Angeles and Neah Bay.
Project Summary
Project Description
1. Identify the problem or opportunity addressed. Why is this request a priority? This narrative should identify
unserved/underserved people or communities, operating budget savings, public safety improvements or other backup
necessary to understand the need for the request. For preservation projects, it is helpful to include information about the
current condition of the facility or system.
Purchase of this property by WDFW will ensure long-term boating access for public recreational fishing at the oldest
operating fishing resort in Washington State, dating back to the 1930’s. This is a very popular recreation area for boating and
fishing, serving citizens from Washington State as well as users from outside the state. The current owner has indicated that
private investors have expressed interest in buying this fishing resort, which comes with the risk of becoming privatized as
their long-term plans have not included use by the general public.
Sekiu, an unincorporated community in northwest Clallam County, is located about41 miles west of the city of Port Angeles on
the west portion of Clallam Bay and the unincorporated community of Clallam Bay. The property is located inside the Clallam
Bay urban growth area (UGA) and is zoned UC, which is a Clallam County designation allowing a mix of residential and low
impact commercial activities. Clallam Bay/Sekiu are designated as a joint Urban Growth Area and are included as one of six
targeted growth areas in the county UGA plan. As last reported Clallam County had a population increase of 20.6% and the
Clallam Bay/Sekiu UGA a growth of 47.5%. Sekiu/Clallam Bay area is a very small rural area with limited permanent
residents, but an area with high seasonal population during sport fishing season.
Sekiu has an estimated population of 44in 2020 and Clallam Bay has an estimated population of 390 in 2022. The number of
people in this area dramatically increase during fishing season. Sequim, located about 55 miles east, is the second largest
city in Clallam County with an estimated population of 7,940 in 2021. The largest city in Clallam County, and its seat of
government, is Port Angeles with a population of 20,020 and ranks49th among the 281 incorporated cities in Washington
State and is the largest city on the Olympic Peninsula.
The Sekiu site historically is a very high use site and provides numerous economic benefits due to its popularity. Because of
its launch type and the water body served the site has no fewer than 70,000 angler trips per year and also supports a large
number non angler boating opportunities.
Sport and commercial fishing are well established industries and critical to the economic viability in this community. The
towns of Sekiu and Clallam Bay depend on sportfishing for much of their annual economic wellbeing. The Clallam Bay
correctional facility provides the only alternate source of employment in the immediate area. Using economic multipliers
provided by Office of Financial Management, sports fishing provides approximately $9 million into the local economy annually.
Sports fishing dollars support local tackle sales, boat repair services, campgrounds, local restaurants and a variety of stores.
This site is a vital regional sports fishing facility.
This site reportedly averages approximately 19,000 boat trips, equating to about 48,000angler trips, during the primary
salmon season of July – September. Halibut fishing is also important in this area, with approximately 4,000 boat trips and
about 10,000 angler trips during the limited season. This site is also a popular sea kayak launch site.
The landowner has been patiently working with WDFW on this project for over six years, and it’s unclear how long he will
continue to work with WDFW. Although the property is not currently advertised for sale, the landowner has been clear that he
will entertain offers as they are received. Funding from the 2024supplemental Capital budget will reduce the risk of time the
landowner may, or may not, work with WDFW or sell to another party who may privatize the resort and eliminate general public
access. Additionally, The Recreation and Conservation Office has indicated that if 2024 supplemental funding is not received
32
477 - Department of Fish and Wildlife
2023-25 Biennium
Capital Project Request
OFM
Version: DH WDFW 2024 Supplemental Request
Project Number:
40000255
Date Run: 9/27/2023 11:59AM
Report Number: CBS002
Sekiu Boat Ramp Acquisition
Project Title:
Project Class:
Program
Description
to acquire this property, WDFW will be advised to return the remaining funding in the current Boating Facilities Program grant.
This will result in the loss of about $950,000 of secured funding in BFP for this project. If WDFW continues to pursue this
project, funding will have to be applied for during the 25-27biennium, thus increasing the risk of time the property may be sold
and/or the current landowner no longer working with WDFW.
If privatized, the public will no longer have access to the Strait of Juan de Fuca for a distance of 62 nautical miles or 100 road
miles, which will also have a devastating impact on the economic viability of the community of Sekiu, which relies heavily on
recreational fishing and boating as its too far from large established commercial centers to offer services or jobs.
Costs associated with permitting and developing a comparable access is exponentially high and unlikely to occur without
significantly investment.
2. What will the request produce or construct (i.e., predesign or design of a building, construction of additional space,
etc.)? When will the project start and be completed? Identify whether the project can be phased, and if so, which phase
is included in the request. Be prepared to provide detailed cost backup.
Purchase of approximately 2.5 acres of uplands, tidelands, and an easement for ingress/egress, including a four-lane boat
ramp and two parking lots, from a private fishing resort in Sekiu, Clallam County, which will provide the only public boat ramp
for saltwater fishing and recreational boating access to the Strait of Juan de Fuca between Port Angeles and Neah Bay. This
proposed acquisition was approved through Lands 20/20 in 2018. BFP funding in the amount of $1,000,000 is secured with a
remaining balance of approximately $950,000. If funded, these capital funds and the remaining BFP funds will be used to
purchase the property. If not funded, the remaining balance of the BFP grant will be returned to RCO.
This project could be phased by purchasing approximately 1.4 of the 2.5 acres, which would exclude one of the two parking
lots. This would reduce the land purchase amount, thus the Capital budget request, by $950,000. The impact of this phasing
would be initial, if not permanent, as there will be crowding at the parking lot adjacent to the boat launch. The second parking
lot is necessary for overflow and will be critical during fishing season openers. Without it, we expect to see cars lining the
road approach, causing significant safety risk and potential resource damage concerns.
3. How would the request address the problem or opportunity identified in question 2? What would be the result of not
taking action?
Purchase of this property by WDFW will ensure long-term public access at a very popular recreation area for boating and
fishing, serving citizens from Washington State as well as users from outside the state.
If WDFW does not acquire this property, there is a potential that public access to the Strait of Juan de Fuca between Neah Bay
and Port Angeles will be lost.
If funding from the 2024 supplemental Capital budget is not received for this project, WDFW will return about $950,000 in BFP
funding back to RCO as there is no current footprint eligible in the BFP with funds remaining. If we lose funding currently
secured, we risk the landowner ceasing negotiations with WDFW with the potential of the property being sold and privatized.
4. What alternatives were explored? Why was the recommended alternative chosen? Be prepared to provide detailed
cost backup. If this project has an associated predesign, please summarize the alternatives the predesign considered.
None explored. The only option is to not acquire this property, which may result in public access to the Strait
of Juan de Fuca at this location being lost to the general public.
5. Which clientele would be impacted by the budget request? Where and how many units would be added, people or
communities served, etc.
33
477 - Department of Fish and Wildlife
2023-25 Biennium
Capital Project Request
OFM
Version: DH WDFW 2024 Supplemental Request
Project Number:
40000255
Date Run: 9/27/2023 11:59AM
Report Number: CBS002
Sekiu Boat Ramp Acquisition
Project Title:
Project Class:
Program
Description
RCO’s Recreational Assets of Statewide Significance In Washington State report from 2019 identifies this boating access at
Seiku as one of only 6 “exceptional Boating Access” areas in Washington’s Peninsulas.
If this property is sold to a private investor and privatized, this would eliminate public boating access at this exceptional
location, resulting in a devastating negative impact to the local economy that currently relies heavily on recreational boating
and fishing in Sekiu.
The Recreational Boating Plan completed by the Recreation and Conservation Office (RCO), state that people spend about
$4.5 billion on recreational boating in Washington State, annually. This makes recreational boating the second highest in
expenditures when compared to other forms of outdoor recreation, behind only to wildlife viewing and photography.
Recreational boating makes up almost 11percent of all expenditures for outdoor recreation in Washington State. Trip-related
expenditures are the total spent on boating, including equipment, travel and lodging, entrance fees, and food and beverages,
and do not include expenses related to boat fuel or launch and moorage fees.
6. Does this project leverage non-state funding? If yes, how much by source? If the other funding source requires cost
share, also include the minimum state (or other) share of project cost allowable and the supporting citation or
documentation.
No. Approximately $950,000 is available from BFP, funding of which comes from a portion of the gasoline tax paid by boaters,
which is also considered state funding.
7. Describe how this project support the agency’s strategic master plan or how would it improve agency performance.
Reference feasibility studies, master plans, space programming and other analyses as appropriate.
State law directs the Washington Department of Fish and Wildlife (WDFW) to protect and preserve fish and wildlife, while also
providing hunting, fishing and other opportunities for people to enjoy the outdoors. Acquiring this access will ensure
long-term access to fishing and non-consumptive outdoor recreational opportunities.
RCW 77.04.012:
· “The commission, director, and the department shall preserve, protect, perpetuate, and manage the…food fish, game
fish, and shellfish in state waters and offshore waters.”
· “…the department shall seek to maintain the economic well-being and stability of the fishing industry in the state.” “…and
shall enhance and improve recreational and commercial fishing in this state.”
· “The commission shall attempt to maximize the public recreational game fishing… of all citizens…”
The Department’s Conservation Principles, Policy 5004
1. WDFW Will Apply the Following Conservation Principles to Management Decisions and Development of Employee Work
Plans:
a. We practice conservation by managing, protecting, and restoring ecosystems for the long term benefit of people, and for
fish, wildlife, and their habitat;
1. We integrate ecological, social, economic, and institutional perspectives into our decision making;
25-Year Strategic Plan:
· Our Foundational Work
o To Provide Recreational and Commercial Fishing Opportunities
§ We ensure recreational and commercial fishing opportunities…
o To Provide Fish and Wildlife Habitat and Recreation
§ We acquire, sell, and work to provide safe public access to WDFW-managed lands.
RCO’s Recreational Assets of Statewide Significance in Washington State:
§ For Boating: “Create authorities where none may exist that prioritize boating infrastructure needs over other forms of
development in areas with limited boating facilities.
34
477 - Department of Fish and Wildlife
2023-25 Biennium
Capital Project Request
OFM
Version: DH WDFW 2024 Supplemental Request
Project Number:
40000255
Date Run: 9/27/2023 11:59AM
Report Number: CBS002
Sekiu Boat Ramp Acquisition
Project Title:
Project Class:
Program
Description
10-year Recreation Strategy for WDFW-managed Lands (2022):
· Vision for WDFW-managed lands
o Abundant recreational, stewardship, commercial, and educational opportunities available to diverse populations
o A department that reflects and connects with the diverse public we serve and is a model of great governance
· Conservation and Recreation Principles
1. Recreation can inspire conservation, and both recreation and conservation are essential to the health and quality of life of
Washington’s residents.
2. Outdoor recreation opportunities must be accessible and welcoming for all visitors to enjoy regardless of ability, race,
socioeconomic status, gender identity, or sexual orientation.
3. Outdoor recreation and conservation require that a diversity of lands and waters be publicly owned, available for public
access, and well stewarded.
4. Public land managers have an obligation to provide sustainable recreation opportunities where compatible with land
acquisition and conservation goals. Recreationists have an obligation to minimize their impacts by recreating responsibly.
WDFW strategic acquisition priorities
· WDFW acquisition priorities:
o Provide access for sustainable fishing, hunting, and other wildlife-related recreational opportunities, which generate
billions of dollars of tourism and are key to the state’s quality of life.
o Preserve working lands for agriculture, forestry, and other sectors of the outdoor economy, particularly in rural areas.
Washington State Recreation and Conservation Plan 2018-2022
· Priorities:
o Sustain and Grow the Legacy of Parks, Trails, and Conservation Lands
o Improve Equity of Parks, Trails, and Conservation Lands
o Get Youth Outside
o Plan for Culturally Relevant Parks and Trails to Meet Changing Demographics
o Assert Recreation and Conservation as a Vital Public Service
Strategy for State Recreation and Conservation Land Acquisition and Development
· Acquisition Priorities 2017-2023:
o Enhancing sustainable fishing, hunting, and other wildlife-related outdoor opportunities by securing land that enhance
recreational access, improving access to marine shorelines for fishing and shellfish harvest, and improving boating
access…
Washington Boater Needs Assessment
· Boating Access
o Providers and boaters alike consider access to be one of the central needs affecting recreational boating in Washington.
The most important issue related to access is the need for additional or improved boat launches: 72% of boaters who
indicated that access issues had taken away from their boating satisfaction cited boat launch ramps as the specific reason.
Similarly, majorities of boating providers indicated that more time and money should be directed toward public access (70%),
including the development of new boat launch ramps (70%) and the management of existing boat launch ramps (55%).Over
two-thirds of providers (69%) said they would like to see more boat launch ramps in their areas in Washington.
· Launches and Facility Development
o Parking at launch ramps (72%) and launch ramps themselves (69%) were the top items providers would like to see more
of…
Purchase oft his property by WDFW will ensure long-term public access at a very popular recreation area for boating and
fishing, serving citizens from Washington State as well as users from outside the state.
8. Does this decision package include funding for any Information Technology related costs including hardware, software
35
477 - Department of Fish and Wildlife
2023-25 Biennium
Capital Project Request
OFM
Version: DH WDFW 2024 Supplemental Request
Project Number:
40000255
Date Run: 9/27/2023 11:59AM
Report Number: CBS002
Sekiu Boat Ramp Acquisition
Project Title:
Project Class:
Program
Description
(to include cloud-based services), contracts or staff? If yes, complete the IT Addendum (available upon request).
No.
9. Is this project linked to Puget Sound Partnership’s “Puget Sound Action Agenda”? If yes, please describe the impacts
on the Action Agenda, including expenditure and FTE detail.
This decision package is aligned with the 2022-2026 Action Agenda Strategy 22 Outdoor Recreation and
Stewardship by funding the acquisition and construction of a boat ramp in Clallam County that will provide the
public with increased recreation opportunities in Puget Sound and the Strait of Juan de Fuca. Through these
efforts this decision package is indirectly aligned with the 2022-2026 Agenda Strategy Action 106 Identify and
fund removal of barriers resulting in the exclusion of people from participating in recreation and stewardship
activities by providing increased public access.
10. Does this project contribute to statewide goals to reduce carbon pollution and/or improve energy efficiency? If yes,
please elaborate.
No.
11. How is this project impacting equity in the state? Which communities are impacted by this project? Include both
demographic and geographic communities. How are disparities in communities impacted?
Sekiu, an unincorporated community in northwest Clallam County, is located about41 miles west of the city of Port Angeles on
the west portion of Clallam Bay and the unincorporated community of Clallam Bay. The property is located inside the Clallam
Bay urban growth area (UGA) and is zoned UC, which is a Clallam County designation allowing a mix of residential and low
impact commercial activities. Sekiu/Clallam Bay area is a very small rural area with limited permanent residents, but an area
with high seasonal population during sportfishing season.
Sekiu has an estimated population of 44 in 2020 and Clallam Bay has an estimated population of 390 in 2022. The number
of people in this area dramatically increase during fishing season. Sequim, located about 55 miles east, is the second
largest city in Clallam County with an estimated population of 7,940 in 2021. The largest city in Clallam County, and its seat of
government, is Port Angeles with a population of 20,020 and ranks 49th among the 281 incorporated cities in Washington
State and is the largest city on the Olympic Peninsula.
Sport and commercial fishing are well established industries and critical to the economic viability in this community as it
depends on sport fishing for much of its annual economic wellbeing. The Clallam Bay correctional facility provides the only
alternate source of employment in the immediate area. Using economic multipliers provided by Office of Financial
Management, sports fishing provides approximately $9million into the local economy annually. Sports fishing dollars support
local tackle sales, boat repair services, campgrounds, local restaurants, and a variety of stores. This site is a vital regional
sports fishing facility.
12. Will the project increase or decrease annual operating costs? If yes, please explain.
Yes. It is anticipated to increase annual operating cost $119,000/year. This is high for water access areas due to the isolated
location and high use. Costs include labor, enforcement, travel, garbage, routine maintenance, indirect and could be
accomplished either by additional WDFW staff or a contractor.
GFS Expenditures with cost/year:
Contracted or Agency Staffing...........................$40,000 - NRS1, 0.5 FTE
36
477 - Department of Fish and Wildlife
2023-25 Biennium
Capital Project Request
OFM
Version: DH WDFW 2024 Supplemental Request
Project Number:
40000255
Date Run: 9/27/2023 11:59AM
Report Number: CBS002
Sekiu Boat Ramp Acquisition
Project Title:
Project Class:
Program
Description
Portable Restrooms...........................................$6,000 - 5 @ @200/month for 6 months
General Access Area Expenses........................$5,000 - 3 person crew for 8 days plus equipment rental
Annual Dock Install / Removal / Maintenance...$43,000
Annual Parking Area Grading............................$15,000
Contingency / Other Unforeseen Costs.............$10,000
Subtotal .............................................................$119,000 per year
13. Is there additional information you would like decision makers to know when evaluating this request?
Budget to acquire land, applicable incidentals, and staff time are as follows:
Expenditure and cost:
Land..............................................$3,380,000 (reviewed and appraised value)
Boundary Line Adjustment ...........$3,000 (est.)
Survey...........................................$20,000 (est.)
Environmental Site Assessment....$60,000 (est.) Anticipating Phase I and II will be needed
Closing Costs................................$100,000 (est.) Large amount due to high purchase price and possibility of paying
non-typical costs, those typically paid for by a landowner, but could be paid for by WDFW
during negotiations
Admin ...........................................$77,000 (est.) 0.1 FTE PAS6 Property Acquisition Supervisor, 0.1 FTE PAS4 Property Acquisition
Coordinator, 0.3 FTE PAS4 Region 6 Lands Agent
Subtotal ........................................$3,640,000
BFP Grant Balance .......................($950,000)
Total Request ................................$2,690,000
Location
City: Unincorporated County: Clallam Legislative District: 024
Project Type
Acquisition - Facilities
Growth Management impacts
There are no growth management impacts
New Facility:
No
Funding
Account Title
Estimated
Total
Prior
Biennium
Current
Biennium
Reapprops
New
Approps
Acct
Code
Expenditures
2023-25 Fiscal Period
001-1 1,190,000 238,000 General Fund-State
057-1 4,015,000 2,703,000 State Bldg Constr-State
5,205,000 0 0 0 2,941,000
Total
37
477 - Department of Fish and Wildlife
2023-25 Biennium
Capital Project Request
OFM
Version: DH WDFW 2024 Supplemental Request
Project Number:
40000255
Date Run: 9/27/2023 11:59AM
Report Number: CBS002
Sekiu Boat Ramp Acquisition
Project Title:
Project Class:
Program
Funding
2025-27 2027-29 2029-31 2031-33
Future Fiscal Periods
001-1 238,000 238,000 238,000 238,000
General Fund-State
057-1 552,000 760,000
State Bldg Constr-State
790,000 998,000 238,000 238,000
Total
Operating Impacts
Total one time start up and ongoing operating costs
Account Title
Acct
Code
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
4.0 4.0 4.0 4.0 4.0 FTE Full Time Employee
238,000 238,000 238,000 238,000 238,000 001-1 General Fund-State
Total
238,000 238,000 238,000 238,000 238,000
Narrative
It is anticipated to increase annual operating cost $238,000 per year and 4 FTE's
38
2023-25 Biennium
Capital Project Request
OFM
Parameter
Agency
Capital Project Number
Project Classification
Version
Biennium
Include Page Numbers
Sort Order
Entered As
2023-25
477
DH-A
2
*
Project Class
Agency Budget
Interpreted As
2023-25
477
2
Project Class
Agency Budget
All Project Numbers
DH-A
All User Ids*
User Id
User Group
No
N
For Word or Excel
N N
39
TAB D – Grant and Loan Programs
40
No Data Available
2023-25 Biennium
Capital Project Request
OFM
Parameter
Agency
Capital Project Number
Project Classification
Version
Biennium
Include Page Numbers
Sort Order
Entered As
2023-25
477
DH-A
3
*
Project Class
Agency Budget
Interpreted As
2023-25
477
3
Project Class
Agency Budget
All Project Numbers
DH-A
All User Ids*
User Id
User Group
No
N
For Word or Excel
N N
41